See below for the before and after pics....
After the prep work of lifting the toilet, removing all the baseboards and transitions in doorways as well as removing the old torn linolium flooring that had been there. I had just finished the cuts in the tiles to accomodate the drain hole in the floor and set a few tiles down to ensure proper fitting.
The finished job with all tiles installed, grouted in and sealed... baseboards and transitions reinstalled and toilet reseated.
No comments:
Post a Comment